Page not found

Search results

  1. Conservation Comm.

    constraints or lack of resources. This panel included state and regional regulators, experts in the field of ...

    05/26/2023 - 1:28pm

  2. Town Crier

    a field trip to Concord visiting the barns of the NH Breeding Association and the mill of the Merrimack ... Please email any of the following: Elvis Dhima- Town Engineer: edhima@hudsonnh.gov Jay Twardosky- Public ... email blasts. On July 3, 2023, a mandatory pre- bid meeting was held at Town Hall followed by a site ...

    09/01/2023 - 7:13am

  3. Planning Board

    in the field to ensure that separation complies with Town standards. The Town should be sure that ...

    01/19/2023 - 11:05am

  4. Planning Board

    the design infiltration rate used in analysis is half of the field rate of the amended soils layer. No ... infiltration basins since the initial submission and the design rate used was half of the tested field rate. ... The applicant noted that basin SMA G had a field rate in excess of the allowable limits and the ...

    02/23/2024 - 10:32am

  5. Benson Park Committee

    in putting his presentation together. He will be relinquishing his proposal of clearing a field and ... reported that he is receiving a lot of emails. He will now be including these in the packets for the ... of the emails was a GPS survey request and he handed that over to the Town Engineer because they are ...

    02/25/2019 - 11:57am

  6. Sustainability Cmte.- CANCELED

    Office Hours that will be added if residents indicate the need by emailing hudsonsustainability@gmail.com ... field. This session focused on Community Power Aggregation in general and included information specific ...

    01/23/2023 - 2:36pm

  7. July 2024

    proceeded from School Street down Lowell Road to Jacques Field. Being the oldest native of Hudson Ralph ... please contact Ruth via email at HudsonHistorical@live.com. The photos of the cane were taken by Sue ... Hudson team. Paper applications are available at the Town Administration Office or online. You can email ...

    07/05/2024 - 4:46pm

  8. Planning Board

    be studied before construction and tested in the field during construction. Mr. Ulery asked if the EV ...

    12/07/2022 - 3:13pm

  9. Planning Board

    of 27%, however field verification by the Engineering Department revealed that this has already been ... Attachment A. Engineering: 1. Based on our field verification, the existing driveway grade is as steep as ... Please see below 1. Based on our field verification, the existing driveway grade is as steep as 28%, see ...

    02/23/2024 - 10:32am

  10. Board of Selectmen

    what was explained to you through an e-mail by the State. With that said as I said to you in that last ... e-mail, Mr. Dhima stated we will look into this once we get into the design phase and once we start ... advertising in NHMA’s website, as well as to the NHAL list serve, as well as independent e-mail to ...

    03/03/2020 - 3:43pm

Pages